The County maintains a diverse portfolio of assets that are required to provide the community of Tillsonburg with the safe collection and treatment of wastewater. The Tillsonburg Wastewater Treatment Plant (WWTP) provides wastewater treatment for residential, commercial, industrial and institutional users in the Town of Tillsonburg.

The wastewater collection network transports waste to the WWTP for treatment. The wastewater collection network consists of a mix of gravity mains, and forcemains. Wastewater flows by gravity wherever possible or using sewage pumping stations (SPS) where changing elevations require. Other specialized structures such as maintenance holes, valve vaults, meter stations, diversion structures and siphons are required to convey wastewater to the WWTP.

 

Inventory

The replacement cost valuation for the linear assets in this portfolio are based on current tender prices, where available. The replacement cost valuation for wastewater vertical is based on the latest information available, which includes current replacement costs, insurance valuations, inflation, and valuations from studies and assessments completed in prior years. Quantity changes are attributed to refinements and updates made to the inventory, ensuring more accurate and current data.

Asset Component Unit Current Inventory Replacement Costs
Wastewater Treatment Plant site 1 $30,562,099
Sanitary Pumping Station bldg 3 1,613,954
Other Facilities bldg 1 302,241
Equipment total N/A 17,497,956
Sanitary Main (=450mm) metre 14,578 23,536,743
Sanitary Main (450mm) metre 111,227 82,732,350
Sanitary Service Connection each 7,004 27,203,536
Total Replacement Cost   $183,448,878

 

Condition

The percentage of assets in poor or critical condition has increased from 15% as reported in the 2024 AMP to 17%. The percentage of assets in good or excellent condition has decreased from 50% as reported in the 2024 AMP to 48%. As assets continue to age their condition rating will decline until lifecycle strategies are triggered and completed.

Loading...

 

Key Performance

The wastewater network collects and treats wastewater from homes, businesses, institutions, and industry. Wastewater travels through the sanitary sewer system to the WWTP for treatment. It is intended that all wastewater assets will be maintained, rehabilitated, and replaced to perform the same function and manage the same capacity as they are currently designed to do.

Key Service Attribute  LOS Statement Performance Measure 2022 2023 2024
Reliability Providing wastewater services with minimal interruptions % of properties within the system boundary connected to the municipal wastewater system 96% 97% 97%
The number of connection-days per year due to wastewater backups compared to the total number of properties connected to the municipal wastewater system. 2 connection-days to 6,325 connections 1 connection-day to 6,460 connections 0 connection-days to 6,767 connections
Environmental Stewardship Providing wastewater services that have minimal impacts on the environment The number of effluent violations per year due to wastewater discharge compared to the total number of properties connected to the municipal wastewater system. 1 violation to 6,325 connections 1 violation to 6,460 connections 1 violation to 6,767 connections

 

 

Proposed Levels of Service Review

Information on scenarios reviewed is contained within the AMP document. As the system’s reserve balance and proposed funding under all scenarios are sufficient to fund the short-term needs, the average expected condition of the portfolio is the same under all scenarios for nearly 40 years, which aligns with the 2025 Budget Survey responses where 67% of respondents indicated that the service level related to municipal water and wastewater services in Tillsonburg should be maintained.

Based on the analysis, staff are recommending Scenario D. The proposed level of service target is to fund the system at 60% of overall lifecycle needs. The use of PVC pipes for linear started becoming popular in the 1970’s; their useful life of 90 years is theoretical as this material has not been in use long enough to confirm the lifespan. Staff also identified an improvement area in 2024, to look at the lifecycle strategies for process assets as it may be beneficial in the long-term to incorporate various strategies and not anticipate a run-to-failure strategy on some of these assets. Once incorporated this may result in reductions to the annual investment required, as such staff feel it is not prudent to target the fully funded scenario at this time.

  Annual Investment Average Condition Average Risk % of assets in poor or critical condition
Scenario A $2,054,000 Fair Moderate 43%
Scenario B 2,533,000 Fair Minor 39%
Scenario C 2,213,000 Fair Moderate 41%
Scenario D 1,520,000 Fair Moderate 51%

 

 

Funding Gap Analysis

Planned Investment Level
An estimated inflationary rate is not included in the planned investment shown in the table below as the 2025 investment level exceeds the proposed investment recommended. Although interest rates are declining, the reserve balance will continue to earn interest and contribute to the planned investment for this portfolio. 

Proposed Investment Change
As the 2025 investment level exceeds the proposed level identified, staff are proposing a one-time reduction to the annual contribution to reserve of $300,000 for 2026, which would result in a reduction in the monthly fixed charge for the average residential user of approximately $3.21 or $38.52 annually. It is important to note that the capital contribution to reserve is only one factor in determining the rates required to support the system’s capital and operating requirements, and the overall rate requirements are determined through each budget process. Although the proposed reduction for 2026 would still result in the annual contributions exceeding the target level, the annual inflationary increases are not anticipated to be required over the 10-year period.

Comparison of required investment to proposed investment (millions)

  2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Required Investment $1.43 $1.47 $1.51 $1.56 $1.60 $1.67 $1.75 $1.79 $1.84 $1.89 $1.93
Planned Investment Level 2.17 2.09 1.84 1.89 1.92 1.95 2.00 2.01 2.03 2.09 2.14
Proposed Investment Change - (0.30) - - - - - - - - -
Unfunded Requirement - - - - - - - - - - -

 

Loading...

 

Search
I want to...
Connect...

Oxford County

21 Reeve Street, P.O Box
1614, Woodstock, Ontario
N4S 7Y3

Tel: 519-539-9800
Fax: 519-537-1053

General Email: customerservice@oxfordcounty.ca 
Email HR (Job Opportunities): hr@oxfordcounty.ca

Office Hours:
Monday to Friday 8:30 a.m. to 4:30 p.m.
(open during lunch)

For an emergency outside of regular hours, please call 1-800-755-0394 and listen for instructions for after-hours emergency calls.

Follow us on

Subscribe

Stay up-to-date on our news, career opportunities, public notices and more by signing up for eAlerts.

Wasteline App

View schedules, receive reminders, and get sorting tips for your garbage and recycling. Download the App (Apple or Android)

Department Directory

The County of Oxford is the upper tier to eight Area Municipalities and is responsible for the provision of a wide range of services to its residents.

View Directory

Oxford County Map

Oxford County offers many geographic data services and mapping products through the Corporate Geographic Information System (GIS).

View Maps