Wastewater System - Norwich

The County maintains a diverse portfolio of assets that are required to provide the community of Norwich with the safe collection and treatment of wastewater. The Norwich wastewater sewage lagoon provides wastewater treatment for residential, commercial, and industrial users in the Village of Norwich.

The wastewater collection network transports residential, commercial, and industrial waste to the lagoon for treatment. The wastewater collection network consists of a mix of gravity mains, low pressure mains and forcemains. Wastewater flows by gravity wherever possible, where changing elevations require the use of sewage pumping stations (SPS). Other specialized structures such as manholes, valve vaults, meter stations, diversion structures and siphons are required to convey wastewater to the lagoon.

Inventory

Asset Component Unit Current Inventory Replacement Cost
Sewage Lagoon System site 1 $7,169,492
Sanitary Pumping Station bldg 3 1,061,272
Other Facilities bldg 1 57,366
Equipment total  N/A  4,174,296
Sanitary Main (﹥=450mm) metre 2,506 2,535,839
Sanitary Main (﹤450mm) metre 30,031 21,313,617
Sanitary Service Connection each 1,546 7,093,048
Total Replacement Cost $43,404,931

 

The replacement cost valuation for the linear assets in this portfolio are based on current tender prices, where available. The replacement cost valuation for wastewater vertical is based on the latest information available, which includes current replacement costs, insurance valuations, inflation, and valuations from studies / assessments completed in prior years.

 

Loading...

 

Condition

The assessment approach for our wastewater assets utilizes a combination of physical assessments, asset attributes, such as material and sizing, as well as established anticipated useful lives.

The percentage of assets in poor or critical condition has increased from 9.4% as reported in the 2022 AMP to 29%. The percentage of assets in good or excellent condition has increased from 36.4% as reported in the 2022 AMP to 41%. As assets continue to age their condition rating will decline until lifecycle strategies are triggered and completed.

Loading...

Key Performance

Key Service Attribute  LOS Statement Performance Measure 2022 2023 Target
Reliability Providing wastewater services with minimal interruptions % of properties within the system boundary connected to the municipal wastewater system 97% 98% TBD
The number of connection-days per year due to wastewater backups compared to the total number of properties connected to the municipal wastewater system. 14 connection-days to 1,309 connections 0 connection-days to 1,314 connections TBD
Environmental Stewardship Providing wastewater services that have minimal impacts on the environment The number of effluent violations per year due to wastewater discharge compared to the total number of properties connected to the municipal wastewater system. 1 violation to 1,309 connections 9 violations to 1,314 connections 0

 

Funding Gap Analysis

This portfolio is currently funded through an annual contribution to the Wastewater - Norwich reserve, by wastewater rates in Norwich, along with an annual allocation of interest earned.

The graph illustrates the anticipated asset management needs (expenditures) and anticipated funding for the 10-year period of 2024-2033, reflecting an approximate $4.4 million surplus in funding availability over the period. 

Although the 2024 to 2033 period is showing a surplus, it should be noted that the current investment falls short of the annual required investment. In accordance with the Water and Wastewater Rates Policy, the annual contribution to reserve should increase annually with inflation. As the annual funding gap is relatively minor, no further strategies are being recommended at this time.